DescriptionThis project will correct continuous nuisance water flows on both Hacienda Dr and Old Bridge Rd. The project scope generally includes construction of approximately 1,300 ft of shallow concrete encased storm drain pipe adjacent to the existing roadway gutters on Old Bridge Rd and approximately 800-ft of storm drain pipe on Hacienda Dr. |